Power plant · Tandridge, England, United Kingdom

Gaywood Solar Farm

Gaywood Solar Farm is a permitted solar power plant in Tandridge, England, United Kingdom, with 10.7 MW of capacity, operated by KYBO Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTandridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNw/O Little Browns Railway Bridge, Hilders Lane, Edenbridge, TN8 6QSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Jan 2024 (permit 23/00505/FUL, Town and Country Planning Act, issued by Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Mar 2023 (reference 23/00505/FUL, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jan 2024 (granted, reference 23/00505/FUL, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKYBO Solar Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2204, 0.0341DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Tandridge, reference 23/00505/FUL)
  2. Permit applied for (planning authority Tandridge, reference 23/00505/FUL)

How it compares

Gaywood Solar Farm is the 1,151st-largest of 1,650 power plants planned, permitted or under construction in England and the 1,850th-largest of 2,548 in the United Kingdom by capacity; its 10.7 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,151st of 1,650171,264 MW<0.1%
United Kingdom1,850th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,893rd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 96 data centers, 58 substations, 21 grid connections (12 operating, 85.8 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Goldman Sachs data center, East GrinsteadData center——11 km
Unit 3Data center——14 km
Unit 2Data center——14 km
Tertiary Study grid connectionGrid connection57 MWPlanned34 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating37 km
Harvard lane PrimarySubstation——37 km
Five Oaks PrimarySubstation——37 km
Hope And Anchor PrimarySubstation——37 km
Solar 3.905 MW grid connection at Five Oaks Farm PVGrid connection3.91 MWOperating38 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom