Power plant · North Northamptonshire, England, United Kingdom

Gaultney Solar Park

Gaultney Solar Park is a power plant in North Northamptonshire, England, United Kingdom, with 20.5 MW of capacity, operated by United Photovoltaics.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGaultney Farm, Pipewell Road, Desborough, NN14 2SWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Sept 2014 (permit KET/2014/0391, Town and Country Planning Act, issued by North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jun 2014 (reference KET/2014/0391, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Sept 2014 (granted, reference KET/2014/0391, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorUnited PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4493, -0.7951DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Gaultney Solar Park is the 565th-largest of 3,430 power plants in England and the 1,067th-largest of 5,050 in the United Kingdom by capacity; its 20.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England565th of 3,43071,985 MW<0.1%
United Kingdom1,067th of 5,050115,642 MW<0.1%
All power plants in our data3,848th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. KET/2014/0391
  2. Started operating

Nearby

Within 50 km of this power plant: 260 grid connections, 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
West Lodge Farm & Rural Centre grid connectionGrid connection——1.2 km
New Albion Wind Farm grid connectionGrid connection——2.6 km
Desborough Airfield A S&S grid connectionGrid connection——3.3 km
The Horizon CentreData center——13 km
Hellermann Tyton DataData center——25 km
Santander data center, EnglandData center——32 km
Weston Marsh to East LeicestershireTransmission line—Planned40 km