Power plant · East Hampshire, England, United Kingdom

Gaston Lane, Farringdon - Solar Farm & Battery Storage

Gaston Lane, Farringdon - Solar Farm & Battery Storage is a planned power plant in East Hampshire, England, United Kingdom, with 44 MW of capacity, operated by Quintas Energy UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Hampshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGaston Lane, Farringdon, GU34 3EEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Jun 2025 (reference EHDC-25-0716-FUL, planning authority East Hampshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorQuintas Energy UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity44 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area68 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1148, -0.9781DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Gaston Lane, Farringdon - Solar Farm & Battery Storage is the 818th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,309th-largest of 3,222 in the United Kingdom by capacity; its 44 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England818th of 2,174186,088 MW<0.1%
United Kingdom1,309th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,449th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 236 substations, 232 grid connections (124 operating, 1,197 MW), 33 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Manor Farm grid connectionGrid connection44 MWPlanned0.2 km
PV Generation grid connectionGrid connection4.75 MWOperating0.2 km
Manor Farm grid connectionGrid connection64 MWPlanned2.9 km
Alton Local PrimarySubstation——4.1 km
Alton BSPSubstation——4.4 km
Herriard PrimarySubstation——11 km
Data center, England (OSM way 1164817477)Data center——22 km
Datum Farnborough Data CentreData center——22 km
Aquind InterconnectorTransmission line—Planned22 km

Operator and place

Grid connections attached to this power plant

More from Quintas Energy UK Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page