Grid connection · England, United Kingdom
Manor Farm grid connection
Manor Farm grid connection is a planned grid connection in England, United Kingdom, with 64 MW of capacity, held by A & W Brock Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | MANOR FARM grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Bramley (Flee)) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | A & W Brock Ltd | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 64 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 1 Nov 2024 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 6 Oct 2027 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.1276, -0.9426 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Manor Farm grid connection is the 470th-largest of 2,533 grid connections in England and the 640th-largest of 3,903 in the United Kingdom by capacity; its 64 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 470th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 640th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 3,770th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 304 power plants (119 operating, 2,072 MW), 243 substations, 66 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Copse Close Solar Farm | Power plant | 49.9 MW | Cancelled | 1.2 km |
| Land to the north and south of Cakers Lane (Wilsom) | Power plant | 11 MW | Operating | 1.7 km |
| Wilsom Farm | Power plant | 11 MW | Operating | 1.7 km |
| Alton Local Primary | Substation | — | — | 3.1 km |
| Alton BSP | Substation | — | — | 3.1 km |
| Bordon Primary | Substation | — | — | 8.3 km |
| Data center, England (OSM way 1164817477) | Data center | — | — | 20 km |
| Datum Farnborough Data Centre | Data center | — | — | 20 km |
| Ark Data Centres data center, England | Data center | — | — | 20 km |
Holder, grid operator and place
- A & W Brock LtdHolder
- Southern Electric Power Distribution plcGrid operator
- Grid connections in England, United Kingdom3,831
- Grid connections in the United Kingdom5,913
- Battery storage grid connections in the UK982
- Solar grid connections in the UK1,291
- The United Kingdom: country profile
- Largest grid connections
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.