Power plant · Test Valley, England, United Kingdom

Fullenton Solar Farm

Fullenton Solar Farm is a power plant in Test Valley, England, United Kingdom, with 4.2 MW of capacity, operated by Tealing Solar Parks.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTest Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Fullerton Farm, Fullerton Road, Cottonworth, Andover, Hampshire, SP11 7JXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Dec 2015 (permit 15/01401/FULLN, Town and Country Planning Act, issued by Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jun 2015 (reference 15/01401/FULLN, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Dec 2015 (granted, reference 15/01401/FULLN, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTealing Solar ParksDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1561, -1.4553DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Fullenton Solar Farm is the 2,319th-largest of 3,430 power plants in England and the 3,459th-largest of 5,050 in the United Kingdom by capacity; its 4.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,319th of 3,43071,985 MW<0.1%
United Kingdom3,459th of 5,050115,642 MW<0.1%
All power plants in our data9,193rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 15/01401/FULLN
  2. Started operating

Nearby

Within 50 km of this power plant: 245 grid connections (134 operating, 1,410 MW), 225 substations, 20 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fullerton Farm PV grid connectionGrid connection3.33 MWOperating0.2 km
Wherwell Solar Farm grid connectionGrid connection32.4 MWPlanned2.4 km
Solar Park Limited grid connectionGrid connection13.6 MWOperating3.6 km
Barton Stacey PrimarySubstation——4.9 km
Andover Town PrimarySubstation——5.6 km
Andover East PrimarySubstation——6.6 km
Sky ChilworthData center——22 km
Venture WestData center——27 km
Regit4uData center——31 km

Operator and place

More from Tealing Solar Parks

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page