Power plant · Test Valley, England, United Kingdom
Fullenton Solar Farm
Fullenton Solar Farm is a power plant in Test Valley, England, United Kingdom, with 4.2 MW of capacity, operated by Tealing Solar Parks.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Test Valley (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Fullerton Farm, Fullerton Road, Cottonworth, Andover, Hampshire, SP11 7JX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 11 Dec 2015 (permit 15/01401/FULLN, Town and Country Planning Act, issued by Test Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Jun 2015 (reference 15/01401/FULLN, planning authority Test Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 11 Dec 2015 (granted, reference 15/01401/FULLN, planning authority Test Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Tealing Solar Parks | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 4.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.1561, -1.4553 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Fullenton Solar Farm is the 2,319th-largest of 3,430 power plants in England and the 3,459th-largest of 5,050 in the United Kingdom by capacity; its 4.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,319th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 3,459th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 9,193rd of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 15/01401/FULLN
- Started operating
Nearby
Within 50 km of this power plant: 245 grid connections (134 operating, 1,410 MW), 225 substations, 20 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Fullerton Farm PV grid connection | Grid connection | 3.33 MW | Operating | 0.2 km |
| Wherwell Solar Farm grid connection | Grid connection | 32.4 MW | Planned | 2.4 km |
| Solar Park Limited grid connection | Grid connection | 13.6 MW | Operating | 3.6 km |
| Barton Stacey Primary | Substation | — | — | 4.9 km |
| Andover Town Primary | Substation | — | — | 5.6 km |
| Andover East Primary | Substation | — | — | 6.6 km |
| Sky Chilworth | Data center | — | — | 22 km |
| Venture West | Data center | — | — | 27 km |
| Regit4u | Data center | — | — | 31 km |
Operator and place
More from Tealing Solar Parks
- Land Hill Farm2.5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.