Frome Valley - Solar Farm
Frome Valley - Solar Farm is a permitted power plant in Herefordshire, County of, England, United Kingdom, with 20.6 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Herefordshire, County of (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Yarkhill, Three Crosses, Stoke Edith, HR1 3SX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 7 Jul 2025 (permit P241510/F, Town and Country Planning Act, issued by Herefordshire, County of) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Jun 2024 (reference P241510/F, planning authority Herefordshire, County of) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 Jul 2025 (granted, reference P241510/F, planning authority Herefordshire, County of) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 20.6 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 29.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.0924, -2.5737 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Frome Valley - Solar Farm is the 1,196th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,868th-largest of 3,222 in the United Kingdom by capacity; its 20.6 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,196th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,868th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,791st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 149 grid connections, 2 data centers and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Foley Farm Solar PV grid connection | Grid connection | — | — | 2.9 km |
| Thingehill Court grid connection | Grid connection | — | — | 4.3 km |
| Larport Farm BESS grid connection | Grid connection | — | — | 5.5 km |
| DXC Technology | Data center | — | — | 25 km |
| Ionos data center, England | Data center | — | — | 31 km |
| Shipton Oliffe Primary | Substation | — | — | 50 km |
Operator and place
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage50 MW · planned
- Newton Wood Farm49.9 MW · permitted
- Rothienorman - Battery Storage49.9 MW · permitted
- Turf Carr Solar Farm49.9 MW · permitted
- Overton Grange, Overton Road - Solar Farm Battery Energy Storage49.9 MW · planned
- Low Farm Solar Farm49.9 MW · under construction
- Brentwood nergy Storage System49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.