Power plant · Winchester, England, United Kingdom

Forest Farm

Forest Farm is a power plant in Winchester, England, United Kingdom, with 3 MW of capacity, operated by NESF and Waltham Solar).

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWinchester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressForest Farm, Winchester Road, Waltham Chase, Southampton, SO32 2LLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Dec 2015 (permit 15/00082/FUL, Town and Country Planning Act, issued by Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Feb 2015 (reference 15/00082/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Dec 2015 (granted, reference 15/00082/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNESF (NESF (formerly Earthworm/Waltham Solar))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaltham Solar) (NESF (formerly Earthworm/Waltham Solar))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area6.67 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9431, -1.1998DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Forest Farm is the 2,525th-largest of 3,430 power plants in England and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,525th of 3,43071,985 MW<0.1%
United Kingdom3,739th of 5,050115,642 MW<0.1%
All power plants in our data9,653rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 15/00082/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 250 grid connections (142 operating, 1,338 MW), 196 substations, 13 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Waltham Chase grid connectionGrid connection2.5 MWOperating0.2 km
Bishops Waltham PrimarySubstation——0.6 km
Solar 11.4 MW grid connection at Bishops Waltham PVGrid connection11.4 MWOperating0.6 km
Glebe Farm grid connectionGrid connection10 MWPlanned1.2 km
Regit4uData center——5.4 km
Botley Wood BSPSubstation——6.9 km
Botley Wood GSPSubstation——6.9 km
SCCData center——8.9 km
AstrohouseData center——9.0 km

Operators and place

Grid connections attached to this power plant

More from NESF

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page