Aller Court Farm Solar Park

Aller Court Farm Solar Park is a power plant in Somerset, England, United Kingdom, with 5 MW of capacity, operated by NESF.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Os 4716 And Os 4300, Church Path, Aller, Langport, Somerset, TA10 0QRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Jun 2016 (permit 14/04300/FUL, Town and Country Planning Act, issued by Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Sept 2014 (reference 14/04300/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jun 2016 (granted, reference 14/04300/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Jul 2015 (refused, reference 14/04300/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jun 2016 (appeal granted, reference 14/04300/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNESF (NESF (formerly British Solar Renewables))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.0579, -2.8626DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (appeal granted, planning authority Somerset, reference 14/04300/FUL)
  3. Permit granted (planning authority Somerset, reference 14/04300/FUL)
  4. Permit refused (planning authority Somerset, reference 14/04300/FUL)
  5. Permit applied for (planning authority Somerset, reference 14/04300/FUL)

How it compares

Aller Court Farm Solar Park is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,758th of 3,43071,965 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 57 grid connections (32 operating, 237 MW), 31 substations, 2 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fleet Air Arm Museum grid connectionGrid connection4.01 MWOperating16 km
Southfield Farm Solar Park grid connectionGrid connection7.6 MWOperating18 km
Larkhill PrimarySubstation——19 km
Chiltern Cantello grid connectionGrid connection4.75 MWOperating19 km
Chilton Cantello PrimarySubstation——20 km
Tata Communications Highbridge DatacentreData center——20 km
West Hendford PrimarySubstation——21 km
Hinkley Point C ConnectionTransmission line—Permitted31 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned31 km