Power plant · Chichester, England, United Kingdom

Ferry Farm - Solar array

Ferry Farm - Solar array is a permitted power plant in Chichester, England, United Kingdom, with 11 MW of capacity, operated by BNRG & Lanlink Estates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChichester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFerry Farm 3 North Chichester Road Selsey, PO20DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Nov 2021 (permit 21/01816/FULEIA, Town and Country Planning Act, issued by Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jun 2021 (reference 21/01816/FULEIA, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Nov 2021 (granted, reference 21/01816/FULEIA, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBNRG & Lanlink Estates LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity11 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area28 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7302, -0.7851DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Chichester, reference 21/01816/FULEIA)
  2. Permit applied for (planning authority Chichester, reference 21/01816/FULEIA)

How it compares

Ferry Farm - Solar array is the 1,429th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,221st-largest of 3,222 in the United Kingdom by capacity; its 11 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,429th of 2,174185,888 MW<0.1%
United Kingdom2,221st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,225th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 114 grid connections (69 operating, 610 MW), 99 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Selsey PrimarySubstation——1.3 km
Port 9.75MW PV grid connectionGrid connection9.75 MWPlanned1.9 km
Ferry Farm PV grid connectionGrid connection4.75 MWOperating3.1 km
Ferry Farm PV grid connectionGrid connection3.8 MWOperating3.1 km
Birdham PrimarySubstation——7.5 km
Rose Green PrimarySubstation——7.6 km
SSE data center, HavantData center——20 km
Aquind InterconnectorTransmission line—Planned27 km
ServerHouseData center——30 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page