Power plant · Bath and North East Somerset, England, United Kingdom

Fairy Hill, Compton Dando - Solar Farm

Fairy Hill, Compton Dando - Solar Farm is a permitted power plant in Bath and North East Somerset, England, United Kingdom, with 2.1 MW of capacity, operated by Environmental Gain Limited and Bath & West Community Energy Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBath and North East Somerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressParcel 6600, Fairy Hill, Compton Dando, BS39 4LJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Jul 2025 (permit 23/04529/FUL, Town and Country Planning Act, issued by Bath and North East Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Dec 2023 (reference 23/04529/FUL, planning authority Bath and North East Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Jul 2025 (granted, reference 23/04529/FUL, planning authority Bath and North East Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnvironmental Gain Limited (Environmental Gain Limited / Bath & West Community Energy Limited, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBath & West Community Energy Ltd (Environmental Gain Limited / Bath & West Community Energy Limited, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area5.42 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3822, -2.5058DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Bath and North East Somerset, reference 23/04529/FUL)
  2. Permit applied for (planning authority Bath and North East Somerset, reference 23/04529/FUL)

How it compares

Fairy Hill, Compton Dando - Solar Farm is the 1,425th-largest of 1,651 power plants planned, permitted or under construction in England and the 2,257th-largest of 2,549 in the United Kingdom by capacity; its 2.1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,425th of 1,651172,174 MW<0.1%
United Kingdom2,257th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,453rd of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 126 grid connections (79 operating, 808 MW), 53 substations, 10 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating13 km
Homewood Farm grid connectionGrid connection1 MWPlanned14 km
Bradford-On-Avon PrimarySubstation——17 km
nLighten BristolData center——18 km
25MW PV Trowbridge Solar grid connectionGrid connection26.6 MWPlanned19 km
Hinkley Point C ConnectionTransmission line—Permitted19 km
Ganbrook grid connectionGrid connection45 MWPlanned20 km
Spring Quarry West PrimarySubstation——20 km
Data center, England (OSM way 996865179)Data center——20 km

Operators and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page