Exeter Substation, Broadclyst - Battery Energy Storage
Exeter Substation, Broadclyst - Battery Energy Storage is a permitted power plant in East Devon, England, United Kingdom, with 125 MW of capacity, operated by Island Green Power.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Devon (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Exeter Substation, Broadclyst, Exeter, EX5 3DB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 20 May 2026 (permit 25/1150/MFUL, Town and Country Planning Act, issued by East Devon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 29 May 2025 (reference 25/1150/MFUL, planning authority East Devon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 20 May 2026 (granted, reference 25/1150/MFUL, planning authority East Devon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Island Green Power | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 125 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 50.7711, -3.3926 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority East Devon, reference 25/1150/MFUL)
- Permit applied for (planning authority East Devon, reference 25/1150/MFUL)
How it compares
Exeter Substation, Broadclyst - Battery Energy Storage is the 238th-largest of 2,174 power plants planned, permitted or under construction in England and the 391st-largest of 3,222 in the United Kingdom by capacity; its 125 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 238th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 391st of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,162nd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 2 grid connections and 1 substation, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Newlands Power Plant grid connection | Grid connection | 52.5 MW | Planned | 31 km |
| Axminster GSP | Substation | — | — | 33 km |
| Pipplepen Farm Solar PV grid connection | Grid connection | 32.6 MW | Planned | 46 km |
Operator and place
More from Island Green Power
- Cottam Solar Project600 MW · permitted
- Green Hill Solar Farm & Battery Storage600 MW · planned
- Green Hill Solar Farm & Battery Storage600 MW · planned
- Lime Down - Solar Project500 MW · planned
- Lime Down - Battery Storage500 MW · planned
- East Pye Solar Farm500 MW · planned
- Abbotshaugh Battery Storage500 MW · planned
- The Droves Solar Farm500 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.