Power plant · North Somerset, England, United Kingdom

Epic Long Ashton, Phase 1 - 3 Office Buildings Solar Farm

Epic Long Ashton, Phase 1 - 3 Office Buildings Solar Farm is a solar power plant under construction in North Somerset, England, United Kingdom, with 1.05 MW of capacity, operated by Epic Systems.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Somerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressEpic Long Ashton, Sw/O Long Ashton Park & Ride, Off Gurney Roundabout A370 & Colliters Way, Long Ashton, Bristol, BS41 9LUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Mar 2025 (permit 23/P/2185/FU2, Town and Country Planning Act, issued by North Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Oct 2023 (reference 23/P/2185/FU2, planning authority North Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Mar 2025 (granted, reference 23/P/2185/FU2, planning authority North Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEpic SystemsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.05 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.95 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4364, -2.6417DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority North Somerset, reference 23/P/2185/FU2)
  3. Permit applied for (planning authority North Somerset, reference 23/P/2185/FU2)

How it compares

Epic Long Ashton, Phase 1 - 3 Office Buildings is the 1,571st-largest of 1,650 power plants planned, permitted or under construction in England and the 2,444th-largest of 2,548 in the United Kingdom by capacity; its 1.05 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,571st of 1,650171,264 MW<0.1%
United Kingdom2,444th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,694th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 93 grid connections (58 operating, 677 MW), 36 substations, 11 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten BristolData center——12 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating13 km
Hinkley Point C ConnectionTransmission line—Permitted15 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned17 km
Insight Data LtdData center——21 km
Homewood Farm grid connectionGrid connection1 MWPlanned25 km
Bradford-On-Avon PrimarySubstation——28 km
Spring Quarry West PrimarySubstation——29 km
Solar 7 MW grid connection at Spring Quarry WestGrid connection7 MWOperating29 km