Power plant · Cheshire West and Chester, England, United Kingdom
Electricity Substation, Bellevue Lane - Battery Storage
Electricity Substation, Bellevue Lane - Battery Storage is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 40 MW of capacity, operated by Coriolis Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire West and Chester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Adj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester, CH3 7EZ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 7 May 2025 (permit 24/00935/FUL, Town and Country Planning Act, issued by Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Apr 2024 (reference 24/00935/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 May 2025 (granted, reference 24/00935/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Coriolis Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2047, -2.8419 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Electricity Substation, Bellevue Lane - Battery Storage is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 135 grid connections (84 operating, 635 MW), 127 substations, 16 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| nLighten Chester | Data center | — | — | 7.4 km |
| The Babbage Centre | Data center | — | — | 15 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 18 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 26 km |
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 27 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 27 km |
| Bold GSP | Substation | — | — | 27 km |
| Unit 1 Junction Lane grid connection | Grid connection | 5.26 MW | Planned | 30 km |
| Parkside Railway Station grid connection | Grid connection | 3 MW | Operating | 31 km |
Operator and place
More from Coriolis Energy
- Y Bryn Wind Farm130 MW
- Glendye Estate104 MW · permitted
- Blarghour Wind Farm84 MW · permitted
- Kirkan Wind Farm81.6 MW · permitted
- Greystone Knowe Wind Farm - Wind Farm75 MW · planned
- Tontine Road - Battery Energy Storage System70 MW · planned
- Vale of Leven Wind Farm70 MW · planned
- Lower Alt Wind Farm42 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.