Power plant · Central Bedfordshire, England, United Kingdom

Double Arches Quarry Wind Turbine

Double Arches Quarry Wind Turbine is a wind power plant in Central Bedfordshire, England, United Kingdom, with 1.5 MW of capacity, operated by Arnold White Estates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressDouble Arches Quarry Eastern Way Heath And Reach Leighton Buzzard LU7 9LF, LU7 9LFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Aug 2011 (permit CB/10/03034/FULL, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Sept 2010 (reference CB/10/03034/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Aug 2011 (granted, reference CB/10/03034/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorArnold White Estates Limited (Arnold White Estates (AWE Renewables))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (1.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9524, -0.6312DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Central Bedfordshire, reference CB/10/03034/FULL)
  3. Permit applied for (planning authority Central Bedfordshire, reference CB/10/03034/FULL)

How it compares

Double Arches Quarry Wind Turbine is the 3,581st-largest of 4,036 power plants in England and the 5,228th-largest of 5,837 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,581st of 4,036134,406 MW<0.1%
United Kingdom5,228th of 5,837200,833 MW<0.1%
All power plants in our data11,990th of 13,0281,354,089 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 70 substations, 61 grid connections (27 operating, 283 MW) and 56 data centers (1 operating, 88 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——11 km
Pulsant Milton Keynes SE-1Data center——14 km
Data center, England (OSM way 460010263)Data center——14 km
East Claydon GSPSubstation——19 km
Pembridge Farm grid connectionGrid connection131 MWPlanned29 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned31 km
Part Haveleys Solar Park grid connectionGrid connection45.5 MWPlanned31 km
Amersham GSPSubstation——32 km
Cokes Lane PrimarySubstation——32 km

Operator and place

More from Arnold White Estates Limited

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page