Power plant · Chichester, England, United Kingdom

Decoy Farm House Solar Modules

Decoy Farm House Solar Modules is a power plant in Chichester, England, United Kingdom, with 6 MW of capacity.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChichester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Oct 2012 (permit 12/01819/FUL, Town and Country Planning Act, issued by Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 May 2012 (reference 12/01819/FUL, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Oct 2012 (granted, reference 12/01819/FUL, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area15.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8293, -0.6890DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its owner? Ask us.

How it compares

Decoy Farm House Solar Modules is the 1,612th-largest of 3,430 power plants in England and the 2,545th-largest of 5,050 in the United Kingdom by capacity; its 6 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,612th of 3,43071,985 MW<0.1%
United Kingdom2,545th of 5,050115,642 MW<0.1%
All power plants in our data8,079th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 12/01819/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 120 grid connections (71 operating, 659 MW), 104 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Decoy South Farm PV grid connectionGrid connection5.7 MWOperating0.3 km
Woodhorn Farm grid connectionGrid connection4.75 MWOperating1.3 km
Landfill gas 1.9 MW grid connection at ChichesterGrid connection1.9 MWOperating1.5 km
Chichester BSPSubstation——3.3 km
Chichester PrimarySubstation——3.3 km
South Bersted PrimarySubstation——3.8 km
SSE data center, HavantData center——21 km
Aquind InterconnectorTransmission line—Planned27 km
IBM HorshamData center——32 km

Place

Grid connections attached to this power plant

Other power plants in England

All 5809 power plants in England, United Kingdom