Power plant · Barking and Dagenham, England, United Kingdom

Connect Waste (Chequers Lane) Power Station

Connect Waste (Chequers Lane) Power Station is a planned power plant in Barking and Dagenham, England, United Kingdom, with 20 MW of capacity, operated by Enzygo) and Riverside Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBarking and Dagenham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address75 - 77 Chequers Lane, Barking and Dagenham, London, RM9 6QJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Mar 2020 (reference 20/00331/CTY, planning authority Barking and Dagenham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnzygo) (Riverside Energy / Enzygo, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRiverside Energy (Riverside Energy / Enzygo, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5183, 0.1479DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Barking and Dagenham, reference 20/00331/CTY)

How it compares

Connect Waste (Chequers Lane) is the 973rd-largest of 1,650 power plants planned, permitted or under construction in England and the 1,574th-largest of 2,548 in the United Kingdom by capacity; its 20 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England973rd of 1,650171,264 MW<0.1%
United Kingdom1,574th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data3,589th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 105 data centers (1 operating, 88 MW), 60 substations, 23 grid connections (13 operating, 101 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
OVH data center, EnglandData center——3.3 km
NTT London 1Data center——3.8 km
Six Degrees Data CentreData center——8.5 km
Tertiary Study grid connectionGrid connection57 MWPlanned16 km
North London (Electricity Line) ReinforcementTransmission line—Permitted17 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating26 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating28 km
Goldsmiths PrimarySubstation——28 km
Volt Avenue PrimarySubstation——28 km

Operators and place

More from Enzygo)

Other power plants in England

All 5872 power plants in England, United Kingdom