Power plant · Fenland, England, United Kingdom

Coldham Estate Solar Farm

Coldham Estate Solar Farm is a cancelled power plant in Fenland, England, United Kingdom, with 10 MW of capacity, operated by ScottishPower Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFenland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSolar Farm, March Road, Coldham, Wisbech, Cambridgeshire, PE14 0LYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Dec 2019 (permit F/YR19/0810/F, Town and Country Planning Act, issued by Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Sept 2019 (reference F/YR19/0810/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Dec 2019 (granted, reference F/YR19/0810/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorScottishPower RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area29.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5969, 0.1346DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Fenland, reference F/YR19/0810/F)
  3. Permit applied for (planning authority Fenland, reference F/YR19/0810/F)

How it compares

Coldham Estate Solar Farm is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,102nd of 3,43071,965 MW<0.1%
United Kingdom1,838th of 5,050115,622 MW<0.1%
All power plants in our data7,081st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Positive ParkData center——5.5 km
Longmarsh Green EnergyData center—Planned20 km
Kings Lynn B Connection ProjectTransmission line—Permitted21 km
Data center, England (OSM way 87850427)Data center——27 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned44 km
Triton Knoll Electrical SystemTransmission line—Permitted44 km

Operator and place

More from ScottishPower Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom