Power plant · Bedford, England, United Kingdom

Clapham Plateau - Solar Farm

Clapham Plateau - Solar Farm is a permitted power plant in Bedford, England, United Kingdom, with 5.5 MW of capacity, operated by Sirius Renewable Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBedford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Of College Farm Green Lane Clapham, MK41 6ETDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Jan 2023 (permit 22/01581/MAF, Town and Country Planning Act, issued by Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Jul 2022 (reference 22/01581/MAF, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Jan 2023 (granted, reference 22/01581/MAF, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSirius Renewable EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area15.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1662, -0.4815DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Bedford, reference 22/01581/MAF)
  2. Permit applied for (planning authority Bedford, reference 22/01581/MAF)

How it compares

Clapham Plateau - Solar Farm is the 1,602nd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,472nd-largest of 3,222 in the United Kingdom by capacity; its 5.5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,602nd of 2,174185,888 MW<0.1%
United Kingdom2,472nd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,599th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 17 data centers, 2 substations and 2 grid connections (1 operating, 4.75 MW), measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——22 km
Data center, England (OSM way 460010263)Data center——23 km
nLighten Milton KeynesData center——27 km
East Claydon GSPSubstation——40 km
Pembridge Farm grid connectionGrid connection131 MWPlanned48 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating49 km
Cottisford PrimarySubstation——50 km

Operator and place

More from Sirius Renewable Energy

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page