Power plant · Windsor and Maidenhead, England, United Kingdom

Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic

Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic is a permitted power plant in Windsor and Maidenhead, England, United Kingdom, with 1.2 MW of capacity, operated by Legoland Windsor Park Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWindsor and Maidenhead (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCar Park Legoland Windsor Resort, Winkfield Road, Windsor, SL4 4AYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jun 2024 (permit 24/01093/CLAJ14, Town and Country Planning Act, issued by Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 May 2024 (reference 24/01093/CLAJ14, planning authority Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jun 2024 (granted, reference 24/01093/CLAJ14, planning authority Windsor and Maidenhead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLegoland Windsor Park LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4655, -0.6544DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic is the 2,015th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,020th-largest of 3,222 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,015th of 2,174186,088 MW<0.1%
United Kingdom3,020th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,251st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 214 substations, 154 data centers (1 operating, 88 MW), 145 grid connections (74 operating, 775 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Clarence Road PrimarySubstation——2.7 km
Eton College PV grid connectionGrid connection3.96 MWPlanned4.1 km
Pulsant MaidenheadData center——5.4 km
Chalvey BSPSubstation——5.4 km
Chalvey PrimarySubstation——5.4 km
CryrusOne LON5Data center——5.9 km
CryrusOne LON4Data center——5.9 km
Generation 5 MW grid connection at Slough Power StationGrid connection5 MWOperating6.3 km
Generation 59.8 MW grid connection at SloughGrid connection59.8 MWOperating6.8 km

Operator and place