Power plant · Windsor and Maidenhead, England, United Kingdom
Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic
Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic is a permitted power plant in Windsor and Maidenhead, England, United Kingdom, with 1.2 MW of capacity, operated by Legoland Windsor Park Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Windsor and Maidenhead (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Car Park Legoland Windsor Resort, Winkfield Road, Windsor, SL4 4AY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Jun 2024 (permit 24/01093/CLAJ14, Town and Country Planning Act, issued by Windsor and Maidenhead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 3 May 2024 (reference 24/01093/CLAJ14, planning authority Windsor and Maidenhead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Jun 2024 (granted, reference 24/01093/CLAJ14, planning authority Windsor and Maidenhead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Legoland Windsor Park Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.4655, -0.6544 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic is the 2,015th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,020th-largest of 3,222 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,015th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 3,020th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 6,251st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 214 substations, 154 data centers (1 operating, 88 MW), 145 grid connections (74 operating, 775 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Clarence Road Primary | Substation | — | — | 2.7 km |
| Eton College PV grid connection | Grid connection | 3.96 MW | Planned | 4.1 km |
| Pulsant Maidenhead | Data center | — | — | 5.4 km |
| Chalvey BSP | Substation | — | — | 5.4 km |
| Chalvey Primary | Substation | — | — | 5.4 km |
| CryrusOne LON5 | Data center | — | — | 5.9 km |
| CryrusOne LON4 | Data center | — | — | 5.9 km |
| Generation 5 MW grid connection at Slough Power Station | Grid connection | 5 MW | Operating | 6.3 km |
| Generation 59.8 MW grid connection at Slough | Grid connection | 59.8 MW | Operating | 6.8 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.