Power plant · Mole Valley, England, United Kingdom

Capel Landfill

Capel Landfill is a power plant in Mole Valley, England, United Kingdom, with 1 MW of capacity, operated by Hanson Brick Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMole Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCapel Landfill Site Capel land adjacent to withdrawn MSW application siteDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2006DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Jul 2004 (permit M003/0878, Town and Country Planning Act, issued by Mole Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Jun 2003 (reference M003/0878, planning authority Mole Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Jul 2004 (granted, reference M003/0878, planning authority Mole Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHanson Brick LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1388, -0.3218DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Capel Landfill is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,301st of 3,43071,985 MW<0.1%
United Kingdom4,866th of 5,050115,642 MW<0.1%
All power plants in our data11,790th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. M003/0878
  2. Started operating

Nearby

Within 50 km of this power plant: 130 substations, 128 data centers and 86 grid connections (54 operating, 440 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Digital Realty LGW16Data center——10 km
4D Data Centers - GatwickData center——10 km
Digital Realty LGW15Data center——10 km
Five Oaks PrimarySubstation——12 km
Solar 3.905 MW grid connection at Five Oaks Farm PVGrid connection3.91 MWOperating13 km
Malham Farm Solar & Storage grid connectionGrid connection20 MWPlanned15 km
Billingshurst PrimarySubstation——16 km
Plaistow PrimarySubstation——18 km
Solar 4.75 MW grid connection at PlaistowGrid connection4.75 MWOperating19 km

Operator and place