Camgrain Store, Newton Road - Wind Turbine is a planned power plant in North Northamptonshire, England, United Kingdom, with 1 MW of capacity, operated by Camgrain.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNe/O Camgrain Store, Newton Road, Kettering, NN14 1FLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Jun 2024 (reference NK/2024/0312, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCamgrain (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (1 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4452, -0.7216DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Northamptonshire, reference NK/2024/0312)

How it compares

Camgrain Store, Newton Road - Wind Turbine is the 1,581st-largest of 1,651 power plants planned, permitted or under construction in England and the 2,458th-largest of 2,549 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,581st of 1,651172,174 MW<0.1%
United Kingdom2,458th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,691st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
The Horizon CentreData center——9.4 km
Hellermann Tyton DataData center——27 km
Data center, England (OSM way 87850427)Data center——33 km
Weston Marsh to East LeicestershireTransmission line—Planned42 km