Power plant · Doncaster, England, United Kingdom
Butt Lane, Hooton Pagnell - Solar Farm
Butt Lane, Hooton Pagnell - Solar Farm is a planned power plant in Doncaster, England, United Kingdom, with 49.9 MW of capacity, operated by British Solar Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Doncaster (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Butt Lane, Hooton Pagnell, Doncaster, DN5 7BW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 5 Dec 2025 (reference 25/02389/FULM, planning authority Doncaster) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | British Solar Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 94 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5678, -1.2645 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Butt Lane, Hooton Pagnell - Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 507 grid connections (216 operating, 2,261 MW), 358 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage and Solar and Wind 62.5 MW grid connection at Hooton Pagnell Hybrid | Grid connection | 62.5 MW | Planned | 0.1 km |
| South Elmsall | Substation | — | — | 2.2 km |
| Solar 25 MW grid connection at South Elmsall | Grid connection | 25 MW | Planned | 2.2 km |
| Wind 8.2 MW grid connection at Hampole Windfarm | Grid connection | 8.2 MW | Operating | 3.0 km |
| Hickleton | Substation | — | — | 3.5 km |
| Brodsworth | Substation | — | — | 3.6 km |
| Thales | Data center | — | — | 12 km |
| HSBC Wakefield Data Centre | Data center | — | — | 17 km |
| nLighten Leeds | Data center | — | — | 17 km |
Operator and place
More from British Solar Renewables
- Frog Lane, Little London - Battery Energy Storage115 MW
- Berden Hall Solar Farm56 MW · permitted
- Brailsford Solar Park, Main Road - Solar Panels55 MW · planned
- Cutbush Farm, Belchamp St Paul - Solar Array50 MW · under construction
- South Fambridge Hall - Solar farm & Battery storage50 MW · under construction
- Worlds End Solar Farm49.9 MW · planned
- Newlands Farm Battery Storage Facility Phase 240 MW
- Tanners Lane - Battery Energy Storage Facility (Phase One)40 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.