Power plant · North Northamptonshire, England, United Kingdom

Burton Wold Solar Farm - Site A

Burton Wold Solar Farm - Site A is a cancelled power plant in North Northamptonshire, England, United Kingdom, with 19.5 MW of capacity, operated by First Renewable Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWold Road (land south of), Burton LatimerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Oct 2014 (permit KET/2014/0540, Town and Country Planning Act, issued by North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Aug 2014 (reference KET/2014/0540, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Oct 2014 (granted, reference KET/2014/0540, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFirst Renewable DevelopmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity19.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area34.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3616, -0.6385DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority North Northamptonshire, reference KET/2014/0540)
  3. Permit applied for (planning authority North Northamptonshire, reference KET/2014/0540)

How it compares

Burton Wold Solar Farm - Site A is the 640th-largest of 3,430 power plants in England and the 1,180th-largest of 5,050 in the United Kingdom by capacity; its 19.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England640th of 3,43071,965 MW<0.1%
United Kingdom1,180th of 5,050115,622 MW<0.1%
All power plants in our data4,120th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
The Horizon CentreData center——17 km
Hellermann Tyton DataData center——24 km
Data center, England (OSM way 87850427)Data center——33 km

Operator and place

More from First Renewable Developments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page