Power plant · Winchester, England, United Kingdom

Bullington Cross Wind Farm (Basingstoke and Deane)

Bullington Cross Wind Farm (Basingstoke and Deane) is a cancelled power plant in Winchester, England, United Kingdom, with 8 MW of capacity, operated by EDF.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWinchester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, SO21 3QFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Apr 2013 (reference 13/00046/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jun 2014 (refused, reference 13/00046/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Jul 2015 (appeal withdrawn, reference 13/00046/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEDFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units4 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1890, -1.3088DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Bullington Cross Wind Farm (Basingstoke and Deane) is the 1,342nd-largest of 3,430 power plants in England and the 2,176th-largest of 5,050 in the United Kingdom by capacity; its 8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,342nd of 3,43071,985 MW<0.1%
United Kingdom2,176th of 5,050115,642 MW<0.1%
All power plants in our data7,598th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 238 substations, 215 grid connections (111 operating, 1,219 MW), 30 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Whitchurch PrimarySubstation——5.5 km
OWLS Lodge Solar Park grid connectionGrid connection9.5 MWOperating6.2 km
Overton grid connectionGrid connection3.2 MWOperating6.2 km
Bransbury Manor Farm grid connectionGrid connection7.2 MWPlanned6.3 km
Barton Stacey PrimarySubstation——6.4 km
Overton PrimarySubstation——8.2 km
Venture WestData center——21 km
Sky ChilworthData center——27 km
Regit4uData center——32 km

Operator and place

More from EDF

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page