Power plant · Tewkesbury, England, United Kingdom
Brockworth Road - Battery Storage System
Brockworth Road - Battery Storage System is a permitted power plant in Tewkesbury, England, United Kingdom, with 20 MW of capacity, operated by Exagen.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tewkesbury (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester, GL3 4WN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 25 Apr 2024 (permit 23/01078/FUL, Town and Country Planning Act, issued by Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Nov 2023 (reference 23/01078/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 25 Apr 2024 (granted, reference 23/01078/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Exagen | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 20 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.8432, -2.1591 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Tewkesbury, reference 23/01078/FUL)
- Permit applied for (planning authority Tewkesbury, reference 23/01078/FUL)
How it compares
Brockworth Road - Battery Storage System is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,200th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 1,875th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,872nd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 92 grid connections (56 operating, 794 MW), 56 substations, 9 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Shipton Oliffe Primary | Substation | — | — | 15 km |
| Whiteway Primary | Substation | — | — | 18 km |
| Bathurst Estates grid connection | Grid connection | 49.9 MW | Operating | 19 km |
| Cirencester Solar Park grid connection | Grid connection | 25 MW | Planned | 19 km |
| Cirencester Town Primary | Substation | — | — | 20 km |
| Crucis Park Estate LLP grid connection | Grid connection | 12.6 MW | Planned | 21 km |
| DXC Technology | Data center | — | — | 23 km |
| Nationwide Swindon Technology Centre | Data center | — | — | 37 km |
| Vodafone | Data center | — | — | 39 km |
Operator and place
More from Exagen
- Old Wood Energy Park - Battery Energy Storage85 MW · permitted
- Holly Lane Energy Park - Solar Farm & Battery Storage75 MW · permitted
- Thurcroft Interchange Energy Park - Battery Energy Storage System50 MW · planned
- Greenhead Energy Park49.9 MW · planned
- Old Wood Energy Park - Solar Pv Panel49.9 MW · permitted
- Mantle Solar Farm, Wymeswold - Solar Farm49.9 MW · planned
- Thurcroft Interchange Energy Park - Solar Farm49.9 MW · planned
- Highfield Energy Park40 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.