Power plant · Braintree, England, United Kingdom

Braintree Road, Cressing - Battery Storage

Braintree Road, Cressing - Battery Storage is a power plant under construction in Braintree, England, United Kingdom, with 57 MW of capacity, operated by Pivot Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBraintree (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressElectricity Sub Station Site, Braintree Road, Cressing, Braintree, CM7 3NADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 Sept 2023 (permit 22/02180/FUL, Town and Country Planning Act, issued by Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Aug 2022 (reference 22/02180/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Sept 2023 (granted, reference 22/02180/FUL, planning authority Braintree)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPivot Power (Pivot Power (EDF Renewables))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity57 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8760, 0.5771DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Braintree, reference 22/02180/FUL)
  3. Permit applied for (planning authority Braintree, reference 22/02180/FUL)

How it compares

Braintree Road, Cressing - Battery Storage is the 396th-largest of 2,174 power plants planned, permitted or under construction in England and the 710th-largest of 3,222 in the United Kingdom by capacity; its 57 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England396th of 2,174185,888 MW<0.1%
United Kingdom710th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,733rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted24 km
Imperium 315Data center——33 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating33 km
Kao Data KLON-02Data center——33 km
Kao Data KLON-01Data center——33 km

Operator and place

More from Pivot Power

Other power plants in England

All 5809 power plants in England, United Kingdom