Power plant · Somerset, England, United Kingdom

Brains Solar Farm

Brains Solar Farm is a permitted power plant in Somerset, England, United Kingdom, with 18.8 MW of capacity, operated by NextPower SPV 13 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSolar Site South Of Brains Farm Moor Lane Wincanton, BA9DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Jan 2022 (permit 21/02205/FUL, Town and Country Planning Act, issued by Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Jul 2021 (reference 21/02205/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Jan 2022 (granted, reference 21/02205/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNextPower SPV 13 LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area29.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.0419, -2.3970DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Somerset, reference 21/02205/FUL)
  2. Permit applied for (planning authority Somerset, reference 21/02205/FUL)

How it compares

Brains Solar Farm is the 1,294th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,026th-largest of 3,222 in the United Kingdom by capacity; its 18.8 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,294th of 2,174185,888 MW<0.1%
United Kingdom2,026th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,108th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 173 grid connections (108 operating, 1,023 MW), 102 substations, 3 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sutor Farm PV grid connectionGrid connection4.28 MWOperating0.3 km
Wincanton PrimarySubstation——1.2 km
Brains Farm CIC grid connectionGrid connection10 MWPlanned1.6 km
Solar 4.75 MW grid connection at WincantonGrid connection4.75 MWOperating2.5 km
Bourton PrimarySubstation——6.0 km
West Stour PrimarySubstation——7.4 km
Hinkley Point C ConnectionTransmission line—Permitted42 km
Data center, England (OSM way 996865179)Data center——44 km
Ark Data CentresData center——44 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page