Power plant · Chichester, England, United Kingdom
Boxgrove Common, Tinwood Lane - Battery Energy Storage System
Boxgrove Common, Tinwood Lane - Battery Energy Storage System is a permitted power plant in Chichester, England, United Kingdom, with 70 MW of capacity, operated by Net Zero Fifteen Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Chichester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Boxgrove Common Tinwood Lane Eartham, PO18 0FN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 23 Jul 2025 (permit 24/02040/FUL, Town and Country Planning Act, issued by Chichester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Sept 2024 (reference 24/02040/FUL, planning authority Chichester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 23 Jul 2025 (granted, reference 24/02040/FUL, planning authority Chichester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Net Zero Fifteen Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 70 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 50.8624, -0.6838 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Chichester, reference 24/02040/FUL)
- Permit applied for (planning authority Chichester, reference 24/02040/FUL)
How it compares
Boxgrove Common, Tinwood Lane - Battery Energy Storage System is the 359th-largest of 2,174 power plants planned, permitted or under construction in England and the 626th-largest of 3,222 in the United Kingdom by capacity; its 70 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 359th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 626th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,580th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 127 grid connections (76 operating, 700 MW), 114 substations, 15 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Chichester BSP | Substation | — | — | 0.6 km |
| Chichester Primary | Substation | — | — | 0.7 km |
| Battery storage 70.4 MW grid connection at Chichester | Grid connection | 70.4 MW | Planned | 1.0 km |
| Waste 6.65 MW grid connection at Chichester | Grid connection | 6.65 MW | Operating | 2.0 km |
| Tangmere grid connection | Grid connection | 4 MW | Operating | 2.3 km |
| Market Primary | Substation | — | — | 7.0 km |
| SSE data center, Havant | Data center | — | — | 20 km |
| Aquind Interconnector | Transmission line | — | Planned | 26 km |
| IBM Horsham | Data center | — | — | 29 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.