Asfordby Business Park (1) is a battery storage plant in Melton, England, United Kingdom, with 23.4 MW of capacity, operated by UK Power Reserve.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Melton (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, LE14 3JL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2019 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Sept 2016 (permit 16/00522/FUL, Town and Country Planning Act, issued by Melton) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 1 Aug 2016 (reference 16/00522/FUL, planning authority Melton) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Sept 2016 (granted, reference 16/00522/FUL, planning authority Melton) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | UK Power Reserve | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 23.4 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with fossil fuel plant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.7800, -0.9212 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Melton, reference 16/00522/FUL)
- Permit applied for (planning authority Melton, reference 16/00522/FUL)
How it compares
Asfordby Business Park (1) is the 818th-largest of 4,036 power plants in England and the 1,362nd-largest of 5,837 in the United Kingdom by capacity; its 23.4 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 818th of 4,036 | 134,406 MW | <0.1% |
| United Kingdom | 1,362nd of 5,837 | 200,833 MW | <0.1% |
| All power plants in our data | 4,087th of 13,028 | 1,354,089 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 2.9 km |
| Experian | Data center | — | — | 19 km |
| Santander data center, England | Data center | — | — | 29 km |
| Santander data center, England | Data center | — | — | 30 km |
| Chesterfield to Willington | Transmission line | — | Planned | 45 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 50 km |
Operator and place
More from UK Power Reserve
- Land off Queenborough Road40 MW · under construction
- Bristol Road20 MW
- Beaufort Road20 MW
- Oil Sites Road9.6 MW
- Vauxhall B (Booston Wood) grid connection20 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.