Linden 345 kV grid connection (PJM C01-1495)
Linden 345 kV grid connection (PJM C01-1495) is a planned grid connection in Union County, New Jersey, United States, with 750 MW of capacity, held by Parkway Generation Operating, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Union County (connects at Linden 345 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Planned (active, cluster C01 Phase 1) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Holder | Parkway Generation Operating, LLC | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 750 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Natural gas | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 27 Apr 2026 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 15 Apr 2031 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection from official notices and registers, newest first. All recent changes.
- Entered the connection queue
How it compares
Linden 345 kV grid connection (PJM C01-1495) is the 3rd-largest of 77 grid connections in New Jersey and the 187th-largest of 4,021 in the United States by capacity; its 750 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| New Jersey | 3rd of 77 | 11,778 MW | 6.4% |
| United States | 187th of 4,021 | 923,876 MW | <0.1% |
| All grid connections in our data | 446th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Due to connect
Holder, grid operator and place
More from Parkway Generation Operating, LLC
- Cheltenham 500 kV grid connection (PJM C01-1494)618 MW
- Linden 230kV grid connection (PJM AH1-722)130 MW
- Linden 138kV & 230kV grid connection (PJM AH1-715)127 MW
- Parkway Generation Operating LLC grid connection (PJM AH1-744)53.5 MW
- Bergen 230kV grid connection (PJM AH1-703)35.6 MW
- Sewaren 230 kV grid connection (PJM C01-1493)18.2 MW
- Bergen Generating Station1,401 MW
- Kearny Generating Station605 MW
Other grid connections in New Jersey
- Sewaren 230 kV grid connection (PJM C01-1086)1,499 MW
- Ocean Wind grid connection (PJM AE1-020)816 MW
- East Flemington 230 kV grid connection (PJM C01-1875)500 MW
- Kearny 230 kV grid connection (PJM C01-1271)450 MW
- Ocean Wind LLC grid connection (PJM AE1-104)432 MW
- Orchard - Cumberland 230 kV grid connection (PJM C01-1443)350 MW
- Landis 138 kV grid connection (PJM C01-1769)325 MW
- Bridgeport 230 kV grid connection (PJM C01-2225)300 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.