Grid connection · Gloucester County, New Jersey, United States
Bridgeport 230 kV grid connection (PJM C01-2225)
Bridgeport 230 kV grid connection (PJM C01-2225) is a planned grid connection in Gloucester County, New Jersey, United States, with 300 MW of capacity, held by Lunar Energy Center II, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Gloucester County (connects at Bridgeport 230 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Planned (active, cluster C01 Phase 1) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Holder | Lunar Energy Center II, LLC | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 300 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Fuel cell (registered as Fuel Cell) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 27 Apr 2026 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 1 May 2030 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Bridgeport 230 kV grid connection (PJM C01-2225) is the 9th-largest of 77 grid connections in New Jersey and the 745th-largest of 3,711 in the United States by capacity; its 300 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| New Jersey | 9th of 77 | 11,778 MW | 2.5% |
| United States | 745th of 3,711 | 833,233 MW | <0.1% |
| All grid connections in our data | 1,052nd of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Holder, grid operator and place
Other grid connections in New Jersey
- Sewaren 230 kV grid connection (PJM C01-1086)1,499 MW
- Ocean Wind grid connection (PJM AE1-020)816 MW
- Linden 345 kV grid connection (PJM C01-1495)750 MW
- East Flemington 230 kV grid connection (PJM C01-1875)500 MW
- Kearny 230 kV grid connection (PJM C01-1271)450 MW
- Ocean Wind LLC grid connection (PJM AE1-104)432 MW
- Orchard - Cumberland 230 kV grid connection (PJM C01-1443)350 MW
- Landis 138 kV grid connection (PJM C01-1769)325 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.