Grid connection · Prince Georges County, Maryland, United States
Cheltenham 500 kV grid connection (PJM C01-1494)
Cheltenham 500 kV grid connection (PJM C01-1494) is a planned grid connection in Prince Georges County, Maryland, United States, with 618 MW of capacity, held by Parkway Generation Operating, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Prince Georges County (connects at Cheltenham 500 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Planned (active, cluster C01 Phase 1) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Holder | Parkway Generation Operating, LLC | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 618 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Natural gas (registered as Natural Gas) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 27 Apr 2026 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 15 Apr 2031 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Cheltenham 500 kV grid connection (PJM C01-1494) is the 4th-largest of 78 grid connections in Maryland and the 216th-largest of 3,711 in the United States by capacity; its 618 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Maryland | 4th of 78 | 15,314 MW | 4% |
| United States | 216th of 3,711 | 833,233 MW | <0.1% |
| All grid connections in our data | 513th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Holder, grid operator and place
More from Parkway Generation Operating, LLC
- Linden 345 kV grid connection (PJM C01-1495)750 MW
- Linden 230kV grid connection (PJM AH1-722)130 MW
- Linden 138kV & 230kV grid connection (PJM AH1-715)127 MW
- Parkway Generation Operating LLC grid connection (PJM AH1-744)53.5 MW
- Bergen 230kV grid connection (PJM AH1-703)35.6 MW
- Sewaren 230 kV grid connection (PJM C01-1493)18.2 MW
- Bergen Generating Station1,401 MW
- Kearny Generating Station605 MW
Other grid connections in Maryland
- Chalk Point 230 kV grid connection (PJM AH1-552 - moved to TC2)670 MW
- Chalk Point 230 kV grid connection (PJM AH1-552)670 MW
- Brandywine 230 kV grid connection (PJM C01-1505)620 MW
- Perryman 115 kV grid connection (PJM C01-1579)555 MW
- Black Oak - Hatfield 500 kV grid connection (PJM C01-1333)500 MW
- Conastone 500 kV grid connection (PJM AH1-725 - moved to TC2)500 MW
- Conastone 500 kV grid connection (PJM AH1-725)500 MW
- Dickerson - Quince Orchard 230 kV grid connection (PJM C01-1885)500 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.