Brookhill Landfill grid connection
Brookhill Landfill grid connection is a grid connection in Wales, United Kingdom, with 1 MW of capacity, held by Ylem Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wales (connection site: BUCKLEY T1 / BUCKLEY T2 / BUCKLEY CROSS T1) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (Connected) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Ylem Energy Limited | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Landfill gas | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | SP Manweb | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 2 Jul 2008 | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Brookhill Landfill grid connection is the 152nd-largest of 158 grid connections in Wales and the 3,835th-largest of 3,903 in the United Kingdom by capacity; its 1 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 152nd of 158 | 21,044 MW | <0.1% |
| United Kingdom | 3,835th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,539th of 7,616 | 1,281,251 MW | <0.1% |
Holder, grid operator and place
More from Ylem Energy Limited
- Knuzden BESS 60MW grid connection30 MW
- Medlock BESS 30MW grid connection20 MW
- Ellen Road BESS grid connection15 MW
- Northacre Industrial Park grid connection7.22 MW
- Ladybank Landfill Lower Melville Wood grid connection2.4 MW
- Lochhead Landfill grid connection2.3 MW
- Cooksland Farm, Old Snydale -Battery Energy Storage50 MW · permitted
- Lovedean Lane - Battery Energy Storage System50 MW
Other grid connections in Wales
- Pembroke Power Station grid connection2,199 MW
- Dinorwig grid connection1,644 MW
- Mona Offshore Wind Farm grid connection1,500 MW
- Connah's Quay grid connection1,380 MW
- Legacy Green Energy Centre grid connection1,200 MW
- Awel Y Mor grid connection1,100 MW
- Cilfynydd Green Energy Centre grid connection1,025 MW
- Pentir Green Energy Centre grid connection1,025 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.