Grid connection · Scotland, United Kingdom

Greengairs Energy Park grid connection

Greengairs Energy Park grid connection is a planned grid connection in Scotland, United Kingdom, with 68 MW of capacity, held by Downing Renewable Development Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Cumbernauld)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (Accepted to Connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderDowning Renewable Development Ltd.SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity68 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date20 Sept 2023SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Jun 2032 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Greengairs Energy Park grid connection is the 131st-largest of 1,518 grid connections in Scotland and the 651st-largest of 4,493 in the United Kingdom by capacity; its 68 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland131st of 1,51896,638 MW<0.1%
United Kingdom651st of 4,493459,551 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Downing Renewable Development Ltd.

Other grid connections in Scotland

All 1518 grid connections in Scotland, United Kingdom

Data on this page