Grid connection · England, United Kingdom

Wreay Solar grid connection

Wreay Solar grid connection is a grid connection in England, United Kingdom, with 4.98 MW of capacity, held by Wreay Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWREAY SOLAR grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Carlisle)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWreay Solar LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLand at Wreay (matched by shared name+coordinates+technology+capacity, 0.26 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toCarlisle BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.98 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date14 Mar 2017SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates54.8192, -2.8976SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Land at Wreay
  2. Permit granted: Land at Wreay (planning authority Westmorland and Furness, reference 15/0653)
  3. Permit granted: Land at Wreay (appeal granted, planning authority Westmorland and Furness, reference 15/0653)
  4. Permit refused: Land at Wreay (planning authority Westmorland and Furness, reference 15/0653)
  5. Permit applied for: Land at Wreay (planning authority Westmorland and Furness, reference 15/0653)

How it compares

Wreay Solar grid connection is the 1,702nd-largest of 2,533 grid connections in England and the 2,639th-largest of 3,903 in the United Kingdom by capacity; its 4.98 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,702nd of 2,533319,370 MW<0.1%
United Kingdom2,639th of 3,903446,745 MW<0.1%
All grid connections in our data6,607th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 135 power plants (41 operating, 489 MW), 46 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Land at WreayPower plant5 MWOperating0.3 km
Newlands Farm WindPower plant6.9 MWCancelled5.1 km
Newlands Farm 2Power plant4.6 MWCancelled5.1 km
Petteril BankSubstation——6.3 km
PirelliSubstation——6.9 km
Morton ParkSubstation——7.9 km
Cross Border Connection (England)Transmission line—Planned37 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page