Grid connection · England, United Kingdom

Wreay Solar Farm grid connection

Wreay Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, held by Harmony Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWREAY SOLAR FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Carlisle)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderHarmony Energy LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCarlisle BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.9 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date17 May 2022SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates54.8285, -2.8984SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Wreay Solar Farm grid connection is the 597th-largest of 2,533 grid connections in England and the 904th-largest of 3,903 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England597th of 2,533319,370 MW<0.1%
United Kingdom904th of 3,903446,745 MW<0.1%
All grid connections in our data4,270th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 135 power plants (40 operating, 484 MW), 45 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Land at WreayPower plant5 MWOperating0.9 km
Newlands Farm WindPower plant6.9 MWCancelled4.1 km
Newlands Farm 2Power plant4.6 MWCancelled4.1 km
Petteril BankSubstation——5.3 km
PirelliSubstation——6.0 km
Morton ParkSubstation——7.0 km
Cross Border Connection (England)Transmission line—Planned36 km

Holder, grid operator and place

More from Harmony Energy Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page