Grid connection · England, United Kingdom
Whitechurch Hill Energy Park grid connection
Whitechurch Hill Energy Park grid connection is a planned grid connection in England, United Kingdom, with 12 MW of capacity, held by REG Windpower.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | WHITECHURCH HILL ENERGY PARK grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Lytchett) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | REG Windpower | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Lytchett BSP (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 12 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 30 Nov 2022 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 2 Sept 2026 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.7953, -2.2235 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Whitechurch Hill Energy Park grid connection is the 1,276th-largest of 2,533 grid connections in England and the 2,022nd-largest of 3,903 in the United Kingdom by capacity; its 12 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,276th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,022nd of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,863rd of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 214 power plants (105 operating, 812 MW), 100 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Blandford Hill - EV Charging Station & Solar Farm | Power plant | 15 MW | Permitted | 0.8 km |
| Blandford Hill - EV Charging Station & Solar Farm | Power plant | 3 MW | Permitted | 0.8 km |
| Blandford Hill Wind Farm | Power plant | 12 MW | Cancelled | 1.2 km |
| Winterborne Kingston Primary | Substation | — | — | 1.4 km |
| Blandford Primary | Substation | — | — | 7.5 km |
| Puddletown Primary | Substation | — | — | 11 km |
| Data Vault - Bournemouth BCP01 | Data center | — | — | 26 km |
Holder, grid operator and place
More from REG Windpower
- Greenburn Wind Park67.2 MW · permitted
- Knockkippen Wind, Solar & Battery Farm60 MW · permitted
- Allt an Tuir Renewable Energy Park59.4 MW · planned
- Clay Tye Road - Solar Farm49.9 MW · planned
- Strath Tirry Wind Farm22.8 MW · permitted
- Knockkippen Wind, Solar & Battery Farm20 MW · permitted
- Old River Don Wind Farm18 MW
- Allt an Tuir Renewable Energy Park18 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.