Grid connection · England, United Kingdom

Vanguard grid connection

Vanguard grid connection is a permitted grid connection in England, United Kingdom, with 1,320 MW of capacity, held by Norfolk Vanguard West Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Necton 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (Consents Approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderNorfolk Vanguard West LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toVanguardNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,320 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2027 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Apr 2028 (stage 2, cumulative 1,320 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection gateGate 2NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Vanguard grid connection is the 47th-largest of 2,678 grid connections in England and the 70th-largest of 4,493 in the United Kingdom by capacity; its 1,320 MW is 0.29% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England47th of 2,678322,469 MW0.41%
United Kingdom70th of 4,493459,551 MW0.29%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 1,320 MW in total

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page