RARE CONTEXT Request research

Grid connection · England, United Kingdom

Tring Road grid connection

Tring Road grid connection is a planned grid connection in England, United Kingdom, with 50 MW of capacity, held by Terra Firma Energy Limited.

Map: where Tring Road grid connection lies
51.8465, -0.7193 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Sundon)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderTerra Firma Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity50 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date13 Jul 2018UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8465, -0.7193UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Tring Road grid connection is the 669th-largest of 3,539 grid connections in England and the 964th-largest of 4,870 in the United Kingdom by capacity; its 50 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England669th of 3,539341,715 MW<0.1%
United Kingdom964th of 4,870467,981 MW<0.1%
All grid connections in our data4,149th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 409 power plants (142 operating, 3,400 MW), 326 substations and 101 data centers (1 operating, 88 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Folly FarmPower plant13.1 MWOperating1.4 km
Straws Hadley Solar FarmPower plant49.9 MWPermitted1.5 km
Hale Solar FarmPower plant40 MWPlanned2.3 km
Arla Dairies Primary 11kVSubstation——3.6 km
Aylesbury East Grid 33kVSubstation——4.4 km
Cheddington Primary 11kVSubstation——4.9 km
Data center, England (OSM way 1254986167)Data center——8.2 km
Data center, Dunstable (OSM way 526426719)Data center——16 km
Data center, England (OSM way 1460602301)Data center—Under construction20 km

Holder, grid operator and place

Other grid connections in England