Grid connection · England, United Kingdom

Thornton Facility grid connection

Thornton Facility grid connection is a grid connection in England, United Kingdom, with 930 MW of capacity, held by Balwen Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Thornton 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (stage 2, Consents Approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (stage 4, Consents Approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (stage 3, Consents Approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (stage 1, Built)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderBalwen LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toThornton FacilityNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity930 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date29 Oct 2032 (stage 4, cumulative 930 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Nov 2028 (stage 3, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date29 Oct 2027 (stage 2, cumulative 200 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Thornton Facility grid connection is the 142nd-largest of 2,678 grid connections in England and the 199th-largest of 4,493 in the United Kingdom by capacity; its 930 MW is 0.2% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England142nd of 2,678322,469 MW0.29%
United Kingdom199th of 4,493459,551 MW0.2%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 2 due to connect, 200 MW in total
  2. Stage 3 due to connect, 400 MW in total
  3. Stage 4 due to connect, 930 MW in total

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page