Grid connection · England, United Kingdom
Springwell grid connection
Springwell grid connection is a planned grid connection in England, United Kingdom, with 1,600 MW of capacity, held by Springwell Energyfarm Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Navenby 400kV Substation) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (scoping) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Holder | Springwell Energyfarm Limited | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Springwell | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 1,600 MW | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | PV Array (Photo Voltaic/solar) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Energy Storage System | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | National Grid Electricity Transmission plc | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 1 Jun 2033 (stage 3, cumulative 1,600 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Oct 2029 (stage 1, cumulative 400 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Oct 2030 (stage 2, cumulative 800 MW) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Springwell grid connection is the 27th-largest of 2,533 grid connections in England and the 38th-largest of 3,903 in the United Kingdom by capacity; its 1,600 MW is 0.36% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 27th of 2,533 | 319,370 MW | 0.5% |
| United Kingdom | 38th of 3,903 | 446,745 MW | 0.36% |
| All grid connections in our data | 56th of 7,616 | 1,281,251 MW | 0.12% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Stage 1 due to connect, 400 MW in total
- Stage 2 due to connect, 800 MW in total
- Stage 3 due to connect, 1,600 MW in total
Holder, grid operator and place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.