Grid connection · England, United Kingdom

Springwell grid connection

Springwell grid connection is a planned grid connection in England, United Kingdom, with 1,600 MW of capacity, held by Springwell Energyfarm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Navenby 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderSpringwell Energyfarm LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSpringwellNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,600 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Jun 2033 (stage 3, cumulative 1,600 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2029 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2030 (stage 2, cumulative 800 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Springwell grid connection is the 27th-largest of 2,533 grid connections in England and the 38th-largest of 3,903 in the United Kingdom by capacity; its 1,600 MW is 0.36% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England27th of 2,533319,370 MW0.5%
United Kingdom38th of 3,903446,745 MW0.36%
All grid connections in our data56th of 7,6161,281,251 MW0.12%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 800 MW in total
  3. Stage 3 due to connect, 1,600 MW in total