Grid connection · England, United Kingdom

Scira-Dudgeon Extension grid connection

Scira-Dudgeon Extension grid connection is a planned grid connection in England, United Kingdom, with 1,350 MW of capacity, held by Sheringham Shoal and Dudgeon Extensions Projco Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Norwich Main 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderSheringham Shoal and Dudgeon Extensions Projco LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toScira-Dudgeon ExtensionNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,350 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2031 (stage 2, cumulative 950 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Jan 2030 (stage 1, cumulative 719 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Oct 2034 (stage 3, cumulative 1,350 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Scira-Dudgeon Extension grid connection is the 45th-largest of 2,533 grid connections in England and the 67th-largest of 3,903 in the United Kingdom by capacity; its 1,350 MW is 0.3% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England45th of 2,533319,370 MW0.42%
United Kingdom67th of 3,903446,745 MW0.3%
All grid connections in our data108th of 7,6161,281,251 MW0.11%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 719 MW in total
  2. Stage 2 due to connect, 950 MW in total
  3. Stage 3 due to connect, 1,350 MW in total

Holder, grid operator and place