Quickbourne Lane grid connection

Quickbourne Lane grid connection is a planned grid connection in England, United Kingdom, with 4.4 MW of capacity, held by IG Renewables Limited.

Map: where Quickbourne Lane grid connection lies
50.9931, 0.6089 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Northiam)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderIG Renewables LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toNorthiam 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity4.4 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date27 Jan 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates50.9931, 0.6089UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Quickbourne Lane grid connection is the 2,476th-largest of 3,539 grid connections in England and the 3,422nd-largest of 4,870 in the United Kingdom by capacity; its 4.4 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,476th of 3,539341,715 MW<0.1%
United Kingdom3,422nd of 4,870467,981 MW<0.1%
All grid connections in our data7,131st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 161 power plants (57 operating, 1,964 MW), 131 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Northiam 11kVSubstation——0.7 km
AHS Energy (Combustion)Power plant4.5 MWCancelled1.4 km
Ham 11kVSubstation——5.9 km
Wittersham 6.6kVSubstation——6.5 km
Netters Farm, Attwaters Lane - Solar Pv ArrayPower plant10 MWCancelled9.8 km
Park Pale House, Mountfield Lane - Solar Panel ArrayPower plant1.2 MWPermitted11 km
CXD Infrastructure SolutionsData center——32 km
CustodianDC MaidstoneData center——32 km
Sota DatacentreData center——37 km