Grid connection · England, United Kingdom

Port of Hull Development grid connection

Port of Hull Development grid connection is a grid connection in England, United Kingdom, with 21 MW of capacity, held by Port of Hull Development.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Port of Hull Generation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
HolderPort of Hull DevelopmentNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSaltend 132/33kV (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity21 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date14 Jun 2018Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date9 Aug 2018Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7423, -0.2347Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Port of Hull Development grid connection is the 1,006th-largest of 2,533 grid connections in England and the 1,622nd-largest of 3,903 in the United Kingdom by capacity; its 21 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,006th of 2,533319,370 MW<0.1%
United Kingdom1,622nd of 3,903446,745 MW<0.1%
All grid connections in our data5,215th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 285 power plants (81 operating, 13,480 MW), 112 substations, 1 gas storage facility and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Saltend NorthSubstation——0.2 km
Saltend 132/33kVSubstation——0.2 km
Salt End LanePower plant49 MWCancelled0.3 km
Yorkshire Water Hull RoadSubstation——0.3 km
Saltend Wind TurbinePower plant1.3 MWOperating0.3 km
H2H, Saltend Chemicals Park, Saltend Lane - Humber Green Hydrogen FacilityPower plant100 MWPermitted0.5 km
Aldbrough Hydrogen StorageGas storage facility—Planned12 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled14 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page