RARE CONTEXT Request research

Grid connection · England, United Kingdom

Ouse Valley Solar grid connection

Ouse Valley Solar grid connection is a planned grid connection in England, United Kingdom, with 13.3 MW of capacity, held by Communities for Renewables CIC.

Map: where Ouse Valley Solar grid connection lies
50.9160, 0.0567 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Lewes Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCommunities for Renewables CICUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity13.3 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date14 Oct 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2030 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates50.9160, 0.0567UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Ouse Valley Solar grid connection is the 1,680th-largest of 3,539 grid connections in England and the 2,387th-largest of 4,870 in the United Kingdom by capacity; its 13.3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,680th of 3,539341,715 MW<0.1%
United Kingdom2,387th of 4,870467,981 MW<0.1%
All grid connections in our data5,964th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 146 substations, 139 power plants (53 operating, 1,129 MW) and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land at Upper Clayhill FarmPower plant4.9 MWOperating0.1 km
Ringmer - Solar array/Battery storagePower plant17 MWCancelled1.3 km
Lewes Grid 33kVSubstation——3.3 km
Bentley EstatePower plant5 MWOperating4.5 km
Lewes Town 11kVSubstation——4.5 km
Lewes Central 11kVSubstation——5.5 km
Goldman Sachs data center, East GrinsteadData center——25 km
Digital Realty LGW15Data center——29 km
Digital Realty LGW16Data center——29 km

Holder, grid operator and place

More from Communities for Renewables CIC

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page