Grid connection · England, United Kingdom
Olives Farm grid connection
Olives Farm grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, connected by South Eastern Power Networks plc (UK Power Networks, South East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Ninfield) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 49.9 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 6 Jan 2020 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Dec 2030 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 132 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 50.8606, 0.3832 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
Olives Farm grid connection is the 698th-largest of 3,539 grid connections in England and the 997th-largest of 4,870 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 698th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 997th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 4,183rd of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 123 substations, 120 power plants (43 operating, 1,206 MW) and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Pashley Farm | Power plant | 11.5 MW | Operating | 3.6 km |
| Pashley Farm, Ninfield Road - Battery Energy Storage System | Power plant | 130 MW | Planned | 3.8 km |
| Moor Hall Farm, Moor Hall Drive - Battery Energy Storage Facility | Power plant | 400 MW | Permitted | 3.8 km |
| Little Common 11kV | Substation | — | — | 4.1 km |
| Ninfield Grid 33kV | Substation | — | — | 4.4 km |
| Ninfield Local 11kV | Substation | — | — | 4.4 km |
| Goldman Sachs data center, East Grinstead | Data center | — | — | 43 km |
| CXD Infrastructure Solutions | Data center | — | — | 48 km |
| CustodianDC Maidstone | Data center | — | — | 48 km |
Grid operator and place
More from South Eastern Power Networks plc
- Shoreham Power Station grid connection460 MW
- Thanet Windfarm grid connection315 MW
- Southfleet Hook Green grid connection300 MW
- Land At Hookers Farm grid connection263 MW
- Eastlands Farm grid connection240 MW
- Bank Farm Solar grid connection99.9 MW
- Barge Way grid connection99.9 MW
- Coombe Farm grid connection99.9 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.