Old Flatts Farm grid connection is a planned grid connection in England, United Kingdom, with 1,500 MW of capacity, held by Net Zero One Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Brinsworth 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderNet Zero One LtdNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toOld Flatts FarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,500 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2035 (stage 2, cumulative 1,500 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2029 (stage 1, cumulative 750 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Old Flatts Farm grid connection is the 29th-largest of 2,533 grid connections in England and the 40th-largest of 3,903 in the United Kingdom by capacity; its 1,500 MW is 0.34% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England29th of 2,533319,370 MW0.47%
United Kingdom40th of 3,903446,745 MW0.34%
All grid connections in our data62nd of 7,6161,281,251 MW0.12%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 750 MW in total
  2. Stage 2 due to connect, 1,500 MW in total