Grid connection · England, United Kingdom

Nursling Flexible Generation grid connection

Nursling Flexible Generation grid connection is a planned grid connection in England, United Kingdom, with 1,500 MW of capacity, held by South Eng Flexible Generation Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Nursling 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderSouth Eng Flexible Generation LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toNursling Flexible GenerationNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,500 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyCCGT (Combined Cycle Gas Turbine)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2038NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Nursling Flexible Generation grid connection is the 29th-largest of 2,678 grid connections in England and the 40th-largest of 4,493 in the United Kingdom by capacity; its 1,500 MW is 0.33% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England29th of 2,678322,469 MW0.47%
United Kingdom40th of 4,493459,551 MW0.33%

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page