Grid connection · England, United Kingdom

Norwich Main BESS grid connection

Norwich Main BESS grid connection is a planned grid connection in England, United Kingdom, with 950 MW of capacity, held by Tasway Energy Park Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: North Anglia Connection Node A 400kV)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderTasway Energy Park LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toNorwich Main BESSNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity950 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2034 (stage 2, cumulative 950 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (stage 1, cumulative 250 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection gateGate 1NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Norwich Main BESS grid connection is the 141st-largest of 2,533 grid connections in England and the 196th-largest of 3,903 in the United Kingdom by capacity; its 950 MW is 0.21% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England141st of 2,533319,370 MW0.3%
United Kingdom196th of 3,903446,745 MW0.21%
All grid connections in our data325th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 250 MW in total
  2. Stage 2 due to connect, 950 MW in total

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page