Norfolk Boreas grid connection is a grid connection in England, United Kingdom, with 1,320 MW of capacity, held by Norfolk Boreas Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Necton 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (stage 2, Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (stage 1, Awaiting Consents)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderNorfolk Boreas LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toNorfolk BoreasNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,320 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Oct 2029 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2030 (stage 2, cumulative 1,320 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Norfolk Boreas grid connection is the 47th-largest of 2,533 grid connections in England and the 70th-largest of 3,903 in the United Kingdom by capacity; its 1,320 MW is 0.3% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England47th of 2,533319,370 MW0.41%
United Kingdom70th of 3,903446,745 MW0.3%
All grid connections in our data114th of 7,6161,281,251 MW0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 1,320 MW in total